Project Overview
Electrical components, switchgear, transformers, and cabling for a power distribution substation upgrade project.
The Challenge
Upgrading a critical power substation required specialized, high-voltage equipment sourced from international manufacturers with long lead times. The project demanded precision in specifications and strict safety compliance throughout the supply chain.
Our Solution
We worked closely with the engineering team to verify exact technical specifications before placing orders. International procurement was initiated early to account for manufacturing and shipping lead times, and all equipment was pre-inspected before dispatch to Zambia.
Key Results
- All specialized equipment delivered to exact specifications
- Zero defects found during pre-commissioning inspections
- International sourcing completed within lead-time projections
- Substation upgrade completed on schedule, improving grid reliability
Project Gallery
Project Details
Category
Energy
Location
Mufulira, Zambia
Year
2023
Duration
10 months
Major Infrastructure
Client
National Power Utility Contractor
Scope of Supply
- High-voltage switchgear and circuit breakers
- Power transformers and voltage regulators
- Underground and overhead cabling
- Control panels and metering equipment
- Safety equipment and earthing systems